FFO-US26: MP 49.2 - 57.45

This project consists of over eight miles of road widening along highway 26.  The construction begins at mile post 49.2 and continues to mile post 57.45.  Work will continue through the summer of 2015.

Back to Current Projects »

 

"K&E’s  product was installed exactly to the plans and specifications and their flexibility in executing the overall project schedule was outstanding. This project required significant coordination with the electrical and H-pile installation contractors, K&E’s support in this area  contributed heavily to the success of the project."

- James W. Stone
Stantec Consulting Services
Scarborough, ME

(Project refers to two solar powered generation facilities in Amity, Oregon.)