OR34 Slide Repair

The section of highway OR34 at MP 47.3 was compromised due to a landslide underneath the road section.  K&E removed all slide debris and loose soils from the site and backfilled with approximately 70,000 ton of stone embankment.

Back to Current Projects »

 

"K&E’s  product was installed exactly to the plans and specifications and their flexibility in executing the overall project schedule was outstanding. This project required significant coordination with the electrical and H-pile installation contractors, K&E’s support in this area  contributed heavily to the success of the project."

- James W. Stone
Stantec Consulting Services
Scarborough, ME

(Project refers to two solar powered generation facilities in Amity, Oregon.)