OR34 Slide Repair
The section of highway OR34 at MP 47.3 was compromised due to a landslide underneath the road section. K&E removed all slide debris and loose soils from the site and backfilled with approximately 70,000 ton of stone embankment."K&E’s product was installed exactly to the plans and specifications and their flexibility in executing the overall project schedule was outstanding. This project required significant coordination with the electrical and H-pile installation contractors, K&E’s support in this area contributed heavily to the success of the project."
- James W. Stone
Stantec Consulting Services
Scarborough, ME
(Project refers to two solar powered generation facilities in Amity, Oregon.)