Pacific Hwy (I-5) @ The Beltline Interchange

The Pacific Highway (I-5) @ the Beltline Interchange in Lane County, Unit 3 project was awarded to K&E Excavating Inc on January 30th, 2013 for $13,368,848.74.  The 21 month job duration of the work included demolishing  the existing Beltline Bridge and construction of a new wider and higher Beltline Bridge.  Three line bridges were built, along with new signals, Illumination, grading and drainage.  During the construction process, several temporary ramps were developed so that the traveling public could safely transition though the work zone.  The completion of all work will be accomplished under the contract date of November 30, 2014.  

Back to Current Projects »

 

"K&E’s  product was installed exactly to the plans and specifications and their flexibility in executing the overall project schedule was outstanding. This project required significant coordination with the electrical and H-pile installation contractors, K&E’s support in this area  contributed heavily to the success of the project."

- James W. Stone
Stantec Consulting Services
Scarborough, ME

(Project refers to two solar powered generation facilities in Amity, Oregon.)